PUBLIC WORKS
Public Works
1441 Schilling Place
2nd Floor
Salinas, CA 93901
Ph: (831) 755-4800
Fax: (831) 755-4958
Disclaimer:
Although every effort is made to provide complete and accurate information on this website and all its documents, users are advised to contact applicable County Public Works, Facilities and Parks before making project decisions and fee estimates.
Davis Road Bridge Replacement
Stay Informed!
During construction, commuters will experience roadway delays. Stay up to date on the most recent construction efforts, changes in traffic control or additional traffic impacts on the Monterey County’s Facebook or X (Twitter).
Project Description
The Davis Road Bridge Replacement and Road Widening Project will construct a new bridge on Davis Road over the Salinas River to replace the existing bridge. The existing bridge is considered a low water crossing and only serves traffic nine months out of the year when the water level is low. The project goal is to provide year around all-weather crossing by constructing a new pre-cast concrete girder bridge that meets the current design standards and will accommodate future demand with four lanes of traffic, two in each direction. Construction activities will include temporary traffic control measures, such as lane closures or road closures depending on the phase of construction. The County will make every effort to keep the public updated on traffic impacts on the County page below.
Construction Timeframe
Construction is anticipated to start in June of 2026. The project is expected to be completed at the end of 2028
Funding
The total estimated project cost, including engineering design, environmental permitting, right-of-way, utility relocation and construction is $96.5 million. The entire project is largely funded through the Federal Highway Administration (FHWA) Highway Bridge Program (HBP) administered by Caltrans. The remaining will be paid through various Grants and local Measure X funds.
Availability of Documents
The following documents are available upon request.
- Davis Road - Signed NEPA CEQA Revalidation
- Attachment 2 - Davis Road - Farmland Analysis Addendum - Final
- Attachment 3 - Davis-Reservation Roundabout Analysis Technical Memo
- Attachment 4 - Davis Road - Visual Impact Assessment - Addendum - Final
- Attachment 6 - Davis Road - WQAR Addendum - Final
- Attachment 7 - Davis Bridge - ISA Addendum - Final
- Attachment 8 - Davis Road - AQ Assessment Report Addendum - Final
- Attachment 9 - Davis Road - Noise Study Report Addendum - Final
- Attachment 10 - Davis Road - Natural Environment Study Addendum - Final
- Attachment 11 - Davis Road Updated CNDDB search results
- Attachment 12 - Davis Road Finding of Not Significant Impact (FONSI)
- Attachment 13 - Davis Road Notice of Determination (State Clearinghouse No. 2013121013)
Contact
Kyle Oyama, EIT, Project Manager II
Phone: (831) 755-5090
Email: Oyamak@CountyofMonterey.Gov
Location Map and Photographs
